Show WAITING FOR MACHINERY WEST MOUNTAIN PLACER operations DELAYED BELATED I 1 marcur mining luning notes good body of ore ora encountered in tho the red cloud ore and bullion I 1 the me officers of the iho west mountain mining company are diann over the continued delay in the tha arrival oval of oc the pumping and bol hoisting stInK jr for their placer ground in lower Bing bangham liam tho the buildings havo bavo long lone been ready to the th much needed pumps PumP sand and engine cne anc sir air john butter of ft I 1 allro west test mountain company was in wt salt lake on monday the company has a shaft down in the gravel of tho main channel in dingham just above the lead mill find and Is 3 waiting tor for tour four cars ot of machinery consisting ot of LIng engines and pumps that were ordered on may lay two cira cars ol of tho the machinery were ordered from youngstown 0 0 and two cars from new york ur mr butter butler la is one of the oldest oiliest placer rn iners in the weist jet mountain t slid and the spot where he hoi halt located his main shaft la Is on a part of the channel han niI that haa never been entered and nt at the same time is 1 believed to contain several bars and the best crevices crevice ot of tho the canyon 0 I 1 |