Show i Echo Project Stock Sock Signed Subscriptions to t stock in the Echo Ech reservoir are over toI I the top though many details rem rein into in to be completed completed before before i work can begin it was reported al althe a al the meeting of the Utah water stage age commission July A P Bigelow igelow 1 submitted a report showing that sib sigr sig ture had been obtainer ob- ob ob obtained for feet Sacre-feet feet acre exclusive of th the the feet e feet acre for which United States reclamation rec reclamation service has agreed to commence commence construction as s soon as the sub subscription of 80 percent per percent percent cent of the 7 acre feet acre feet of storage or acre fe acre feSt t has been approved Work is being pushed ahead in ob- ob obtaining ob obtaining taming descriptions ns of property to tobe tobe tobe be submitted to he reclamation ser ser- service service ser service vice for repay repay- repayment repay ment meat ment of the construction construction costs Mr Ir Bigelow declared declared George 11 M Bac Bacon secretary Bacon n secretary of the commission and state te engineer was t to write the subscribing companies urging early actIon in submitting the descriptions of the o be pledged property as see se- se se- se e x the molasses is a at the Cullen Service Station at Bountiful Bountiful donated by the Layton Sugar Co The other materials can be at drug drugstores drugstores drugstores stores Demonstration tion on mixing will willbe willbe willbe be given bythe by the c my nt agen when re- re requested requested re requested quested |