Show EUREKA HOLLY rebuilding PLANT RECENTLY DAMAGED BY FIRE the eureka holly mining company is losing no time in replacing the hoist and power plant that was badly damaged by fire four weeks ago and in building a new shaft house according to nevada advices advises ad vices losses were promptly adjusted by the fire insurance company with which the property was insured and supt bupt R E wadleigh was summoned to san francisco by W A barnes general manager to assist in placing b orders for new machinery supt bupt wadleigh returned to the mine saturday and several carloads of lumber have arrived for the shaft house the companas comp anys ton concentrating b plant which was not damaged is almost completed the richmond eureka mining company has completed the shipment of 1000 tons of ore from its mine on ruby hill to the midvale utah smelter of the U S smelting smelling Sm elting refining mining company and has discontinued shipping for the present the ore is of low grade taken from the old workings gs on and above the ft level and contains a high iron content the richmond eureka 1 is s controlled by the U S company and is drawn upon for this desirable fluxing flexing ore as it is required the company is diamond drilling b vertically from the ft level prospecting for the ore bearing limestone northeast of the ruby fault the huge deposits of ore that made the mine famous were on the opposite side of the fault the theory of geologists b is that this segment of the ore bearing limestone was thrust up from the depths and that a corresponding block vf of limestone will be found below drill cores are shipped to one of the utah plants for analysis and no information is available here as to what has been encountered |