Show the american flag mine at park city has put on a second shift of men and is carrying out the development which had been outlined for the time when the raise en cn the 1100 should reach the 1000 which happened just as we went to press with our last issue 0 the tramway of the rocher de boule at new hazleton british columbia is making good progress and it is expected that ore will be sent over it in the early summer it will be three and one half miles long and will connect the mine with the railroad developments designed to increase its resources in lead and silver were authorized by the directors of the lawrence mining Mil milling lint company at a session at the property near Clark fork idaho recently W L shuck the secretary has just returned to spokane the initial work will be the advance of the main tunnel for feet this is expected to connect the tunnel with the chief vein a body having a width of 17 feet at the surface the point of intersection will be at a depth of 1000 feet extensive development of the vein laterally and vertically is contemplated the work will be directed by joe reed the manager manage who has been identified with the mine since it was a prospect A check for was received this week by secretary shuck in payment for 53 tons of concentrates shipped to a smelter at east helena the average value of the ore was 72 per cent in lead and ounces of silver to the ton all of this ore came from the no 1 vein |