Show plans for another drainage tunnel in the cripple creek colorado district are under consideration T R Country countryman mano the construction st engineer of the roosevelt tunnel has been asked to lepare a report the roosevelt tunnel will add feet to the workable depth of the cripple creek mines and it will probably be six or eight years before the drainage effected by this tunnel is completed according to the plans now under consideration a tunnel feet deeper er is to be driven by taking plenty of time for the work it is believed that the cost of driving the proposed tunnel can be kept within |