Show R G W HEADS HERE Looking After Arrangements for the New Smelter General Manager A C RIdgeway of DC o the Rio Grande Grando road Chief C ller Engineer E K J Yard and General Traffic Manager A S Hughes were in Salt Lake all aU day ilay yea vea ea looking after traffic arrangements in connection with the new steeLIer smelter near Garfield Beach The three men spent the greater j rt of ot thuda the day on the road and in the even evening evenIng evening ing conferred with other railroad of officials officials They The are staying at the t e Knute ti ford The Rio Grande road rhad has haa a line under construction from rein the mouth of ot Bingham canyon on to the smelter site ite and andon andon andon on this line Une it Jt depends for heavy ore oe traffic Concerning the construction of or O 3 new cars and the building of new shops shop Mr Ridgeway Ridgoway Rid eway yesterday confirmed the an announcement announcement made several days d 11 ago 0 in inThe inThe inThe The Herald The shops sho end cars will be built as was vps then told I |