Show RICH RI H CARISA ORE S Fifty Tons From Level Le el Work Workings WorkIngs rk ings Nets Over lust Just to illustrate the character of ore that is coming from the foot of the th Carisa Tintic mines Manager H Ei S Joseph stated yesterday that a car carload carload carload load of ore fifty tons would be settled for during the day and that the company pull pul down over 70 0 a ton for the lot lotIn lotIn 1 In other words the consignment would net over 5 This ore comes from that portion porton of the th property where such sensational develop developments developments developments ments have been taking place during the thep past imst p st few weeks and from which it is ex cx expected that a great tonnage will wi be mined after atter elbow room is made the miners miner employed there The sampling of the ore bodies on this level for the past four days das Mager lI rager Joseph states have Slown the presence pr of 10 per cent copper thirton ounces silver siver and 38 8 in gold per ton In addition iton to the rich grades arc coming regularly to market |