| Show MILL FOR THE FLORENCE One of Eighty Tons Capacity to Go Gc Up at Once Special to The Herald Goldfield Nev Nov Oct 8 Telegraph or orders ordera nera ders have been received from T G Lock Lockhart Lockhart Lockhart hart general manager of the Florence Goldfield mine to start work on the comp ys mill Lockhart is now In Den Denver Denver Denver ver where he has been conducting tests on ore from the mine but it is expected lie he le will return and give the work his per personal personal personal attention The mill mm will have a capacity of eighty tons a day clay and will willbe willbe willbe be built alongside the railroad track at atthe atthe atthe the mine It will be so constructed that the ore can be dumped directly into the crusher from tram the skip and fed automat automatically to the stamps Ore bins have been built bunt on every floor In the mine so that the ore can be loaded Into the skip and the mine maine is capable of ot delivering a ton a minute There are many thousands of tons of milling ore in the mine which will aver average age ge probably 30 per ton In the Reilly lease worth of ore was taken out during the last l st days and the lessees were obliged to leave a fortune when their lease expired The workings have been connected up with the company and everything is in shape for the new mill millAn millAn millAn An vein of copper ore orelias has lias been opened on the level of the mine the first red metal yet et found In the camp Twenty leases are working on Florence ground and four of them are In ore |