Show MIXING MINING NOTES Good progress In accumulating a atonal ma material 1 tonal for the Nevada Douglas rn slon alon of or the Nevada Copper Belt Bel railroad and in grading for the Mason Valley Valey smelter extension Is reported by b Man Managing Managing an aging Director Walter Valter q G t Orem who arrived home from Yering ton district Grading for tor the smelter i extension Is nearly complete completo and the I laying of rails will wil be commenced soon At the Nevada Douglas mine the new big hoisting works have havo been Installed and the double tracked In ln Inclined dined shaft Is ready read a for service |