Show WESTERN PACifiC BUSY Repair Work Being Rushed Bushed and Will WillBe WillBe WillBe Be Completed This Week eek I The Thc Western West rn Pacific road hopes to toha t ha have e the damaged portion of its line at atthe atthe atthe the southern end en of Great Salt Lake restored to service serice by next Sunday An unusually large crew of men have been at work and It Is now believed that the necessary repairs will have havo been completed b the end of o this week so that train service serice may b bG be resumed Sun Sunday Sunday Sunday day or Monday Monda It Is I understood under Irom semiofficial sources that the Western Pacific plans t to raise the tracks In the devastated portion about six feet f t above the present grade This will be followed by the I driving of piles along the north side of or orI I the track at all points where it Is be believed believed there may be any danger from fromI I waves naves damaging the roadbed in ehe cite future After these the e piles are driven I the e between them and the road roadbed roadbed I bed will be bp filled with rocks and gravel which will greatly strengthen the road roadbed roadbed roadbed bed and It is believed eliminate all future possibilities of ot damage In the meantime preparations for the opening of the line Une to passenger service on June Juno 1 continue to progress Vice President Schumacher according to ad advices advices vices sices from San Francisco is busy mak making makIng ing lug traffic staff appointments pre pro preparatory preparatory to a full operation of the road Mr Schumacher Is expected to come to Salt Lake within the next few weeks at which time a positive state statement meat ment as to the beginning of passenger service is ts expected to be made when preparations for the big Jollification celebration planned by the Salt Lake Real Estate association will then progress |