Show I DISCUSS DRAIN DR IN PROBLEM Railroad and City Engineers Talk Over Needed improvement Troublesome questions regarding the drainage at the Rio Grande depot were discussed yesterday afternoon by T OS G 1 Gwyn chief engineer en of ot the railroad City Engineer George F McGonagle antI ard Mayor Maor John S Bransford The officials official inspected the depot site and later con continued the discussion In the city engi engineers engineers engineer neer office Mr Gwyn came to Salt Lake from Denver upon invitation from the city engineer t to discuss the tho mat matter matter matten ter ten fully tully with some someone one in authority and take some action which would set tle tie the drainage problem at Third West and Third South streets The city be believes believes a concrete aqueduct should be constructed from tram Third West to Sixth West or Seventh West streets and be the Rio Grande Grando should pay for It as the new depot has blocked Third South street at this point |