Show SALT tAKE LAKE FIRMS As WIN OUT Contracts Awarded for Con Construction Construction of Works of Idaho I Project Special to The Herald Washington Feb secretary of the interior today awarded the fOllowing contracts for construction of dam canal and In connection with the Irrigation project Idaho Schedule 1 for dam and diverting works en n Boise river to Utah Fireproof Fireproofing inS ing company Salt Lake City Schedule 3 for main canal from Indian Creek to Deer Flat reservoir to Conway state of Idaho Schedule 4 for structures on canal from Boise river to Deer Flat IncludIng leg Ing bridge structurES turnouts culverts and drops and diverting works from In IndIn than dIn Creek to Page BrInton Salt Lake Schedule 6 for lower Deer Flat embank embankment meat ment and diverting works mo to Hub Hubb Hubbard b bard rd Carlson Carison Boise City Ida The secretary of the Interior has di directed directed that there be a new advertisement for the south si side e of the canal from Boise rIver to Indian creek and also au an the reclamation service to corn com tile the upper Deer Flat embankment and diverting works Award of contract for gates and lifting devices is held In abeyance |