Show South Dakota Project ct is Completed and Acres Are Ae Now Open to l tion I I V VI I i SL Washington March Manh 6 Baum ger gee has announced the completion of the second unit of the Bell Iehl fe e South Dakota Irrigation project embracing 10 io 0 acres seres divided into forty end and eighty acre farms These farms seA are available for entry under the th homestead sit and reclamation reclamation mation matlon laws 4 No lottery system Is to be settlers settlors being required after making choice of a farm to file their entries in inthe Inthe Inthe the local land office A cash cas payment of ot per acre must be made macic at the tue time of filing to cover the first installment of the building maintenance and operation charges The area open to entry Includes some lome of the choicest St farms In this thia project situated I close to a railroad near private lands hands that are selling ClIng for 25 to m 30 50 per acre acrel without water rights l The entire cost of water rights for a farm Is 1200 1300 payable In ten I annual Installments of each without I interest on deferred payments |