Show GOLD CROWN CONNECTS CON MAIN MINE WORKINGS Word ord that connection has lias been made ma e between the Gold Circle Crown company shaft and long bong tunnel was s received yes yesterday by S M Levy Ln To make the tho connection a raise of nearly nearby feet Ceet was wa driven front from the tunnel to the th bot bottom bottom tom torn of ot the shaft The Time shaft is in ore all al the way down with sulphides the last lat 0 feet The Tho tunnel Is Just entering the te ore shoot with ih values improving as 3 it Is isI I driven ahead It I wilt will wi gain depth as ns It leaves the tile shaft and It is expected that I the time best part of ot the mine will wi bo be bl be between between between I tween the shaft and the tunnel which is i being driven IMn from the opposite side sl e of the time I mountain The Time east tunnel has already passed through a shoot of high hl h i grade ore and it I is ls Just entering another I promising values alues shoot which shows fair milling miling I |