Show I SUNNYSIDE OPERATIONS I 1 I What Manager John Is Do Doing Doing ing at Thunder Mountain R L Harley Is down from Crom the Sunny Sunnyside Sunn Sunnyside side compan s properties at Thunder Mountain to remain through the winter He states that General Manager John has been fortunate in getting Into camp most of the new equipment for forthe forthe forthe the milling plant and that t at the balance en I route will be shortly delivered It is hoped to have the reconstructed plant In 1 full fuU operation by b the first day of or Jan January Jani January uary and nd Mr Ir Harley Is confident that I Manager will turn tum the trick without trouble Included In the new equipment Is eight Garvin electro gold that have a capacity for handling tons of ore per day da There is to be no attempt at separating the sands and slimes slime the proposition being to treat them direct and together In the cyanide tanks Manager now has the ore body opened up for a length of feet with the workings still in ore The deposit has also been opened and proven on its dip to a depth of or ro feet and its thickness has been shown to be from to thirty feet Whether Mr Ir will come out from camp for a holiday visit at home depends depend I on the progress made in getting the milling plant completed |