Show STARTS SURVEY WORK United States Geological Survey En Engineer gincer Goes to Strawberry Valley VaHey to Begin Labors Engineer T C Callister of the United States Stat s geological survey urve ha hat hiltS gon aone to Strawberry valley to lo make u It I I complete hydrographic h survey urey of that thal region preparatory to the beginning If f work ork on the proposed Strawberry valley va reservoir The Tue work will be started as aa soon as the survey turvey is completed and nd the th snow is off the ground Mr 11 Callister ollister went into th the v y on snowshoes with no protection from f om the th elements element pJ m nh except pt a small tent flit t itt a blanket and a dozen I boxes of or matches |