Show CHEYENNE PUBLIC BUILDING BIDS FAIR TO BECOME COSTLY Special to Tho Herld Washington T D Th C C March SI 31 For Forster star ster Smith of ot Minneapolis contract contractors ors who built buit the time federal building at Cheyenne Che enne have lied ted a claim caim with the treasury treasur department IU for for fO ex cx extra extra tra work over oer their contract c which they they state they perfOrmed 11 f in accord accordance mince ance nn c with orders given then iem by b r A T Hoyt superintendent of or construction AhUe the building b i ing was being bein erected d Forty Fort thousand thousand dollars of the claim is tom for alleged interference of Hoyt with wih workmen of Forster Smith and for I compelling them to needlessly tear teardown teardown teardown down work already completed Full settlement with wih Forster Smith for Work on oft of the Cheyenne Che enne building b was made by the treasury department se sev eral era weeks ago and lUd if the th additional claim Is collected it must be by b con cou congressional gressional legislation The rime supervising architect will wJ adver ader advertise the tise U e for foj 01 bids AV week eek for constructing the the federal building at Laramie which will wi conform to modified plans which have haxe been in course of oC preparation since the failure fiure of or the contractors to accept the contract awarded them un under under der del the previous letting |