Show WORK ON CUTOFF Reno X Nov Nev v March h 14 Work on the I new cutoff of the Southern Pacific l be between between I tween Hazen and Fort Churchill Churchil Nev connecting the tho h main line 1 with the lie Carson 1 Colorado No Noh giving i I it direct r J hc communication m i tion Uon with wih the rich gold old camps camp of if southern Nevada begins tomorrow morning Con Construction Construction outfits from all al over the coun country country try are are now being unloaded at The Tho work will wi require about three mouth It I means mens a great saving sving to tho the Sout rn Pacific as us three changes are now necessary nece sary in order to get freight Into nto the tho mry camps Railroad men of experience think It Is but the first work of ot a railroad into 1 Los Angeles to compete with the Clark line Une now in operation through this state |