Show BIDS ARE REJECTED Board of Public Public Works Thinks They i Are e Too High Ea h I IThe The board of ot public works yesterday turned down the bids of or the V City Street Improvement company for and P J Morin Moran for for the con can construction of fire cisterns City Engi Engl Engineer Engineer neer Kelsey estimated that hat the con cob construction ought not exceed ed hence Clerk Whitaker was Instructed to no notify notify the council of or the action of or the board at nt the same time recommending that the work be under Engineer supervision and estimate When Vh n bids bIas the construction of o othe the main sewer on South Temple street were opened It was nas found round that only two companies care care to do the work P J Moran will wilt excavate and back fill fillat fillat fillat at 87 cents per cubic foot will furnish pipes at and pipes s at and construct the man holes at 93 each The Colo Colorado Colorado Cob rado ratio company compan the other bidder esti estimates estimates estimates mates excavating and filling at 75 15 cents per cubic yard This company will furnish pipes at 1 and pipes at and will construct man holes at 65 each Clerk Whitaker was as Instructed t td d to compare the bids with those of f previous previOus rerI ous years and report at the next meet ing lug of ot the board which will be held Monday at p pm m V |