Show MONTGOMERY MOUNTAIN MINE Manager Johnson Reports Having Cut One Ledge in Tunnel 11 M M 1 Johnson Samuel Newhouse chief representative In the field has just returned from Bullfrog where he has been noting the progress made In the de development of the Montgomery Mountain Mining property the control of which Is now flOW exercised by bv Mr He reports that a strong fissure has been cut in the present tunnel working workings and that while the tunnel wi will be pushed right ahead for the ledge that has made the famous the ledge just cut wi will be prospected There Is nothing sn sensational atonal about the strike just made though good values alues were fond found in iii the or ore At the same time another tunnel has hasben ben been started on the other end of the gound ground and that is to be pushed just as rapid rapidly I as possible with everything to indicate that the cot cost of doing the work wi will be money wen well spent Mr Johnn Johnson says the expectation i is that the Clark rod road wi will have been finished to Gol Gold Center ten mie miles from Rhyolite by bythe bythe the middle of next month With Uh that un understanding he be wi will during the next few days Dlce olace an ord order r fol for the compressor an and power dri drill plant that lie he has 11 been beenS S so anxious to install at the Montgomery Mountain He Hc is willing to stand a wagon haul o of ten mie miles to get it but he was not Dot willing in the tart art to by buy such a plant as he wanted and stand the wagon haul baul from Ls Las Vegas Mr lr Johnson is very er sanguine of obtaining big results from the work now in hand |