Show NEVADA CON SMELTER Plant at Ely Will Have a Capacity of 2500 Tons Daily of company sa development work at the at Ny baa demonstrated enormous bodies of ore averaging much higher titan wa at the time of the organization of the company At that time It was that ore 1 per cent bUt assays In everY have fox some time been between ni i per cent It was to build a smelter at Ely with a Capacity of tons but mine the building of a larger tant and the hat tieI capacity will be tons bisted of 1050 tone whole with be carried out upen a larger scale than was at first anticipated Three prominent London have recently made an of the property which has been followed by a in the shares from England |