Show SECOND RAISE IS THROUGH Cactus Bonanza Will Begin Heavier Production Next Month Manager Lafayette says raise No through the various levels of the Cactus mine front the or tunnel level to level No 1 has been A large force af men is Ja tim hoeIng and placing the raise in shape for ore and by the middle of pe ember be expects to have everything itt for the heavier production With the one avenue through which to the ore from the upper levels to th tunnel level It has been physically for the manage moot to get out more than about tons ot ore a day to the nit raise in it is the in to raise the to an aver ego of 7 tons of ore a day without do lay That the will be increased to tonj early In the is rac |