Show staves arrive for pipe line one car of staves and one of bands for the big pipe line in farmington canyon arrived in farmington tuesday two more cars of staves are on the way the staves come from the state of W washington ashin 0 ton and the bands fro from in lo 10 angeles the pipe line is twenty four inches in diameter and considerably over a mile in length it will take about fifteen men twenty live five days to do the work an overseer is expected to arrive here monday when tile the task of making and putting in the pipe will be begun ca there was never less than nine second feet of water in the creek during tho the coldest weather |