Show the th work WU will continue contino the divisions of 0 the baltimore A ohio railroad nail road west of 0 the ohio river are to receive the same sort ot of improvements prove ments menta that have been made on the lines east of 0 the ohio not only are the grades to be reduced wherever it Is practicable but very much heavier motive power Is to be introduced in order to carry the additional weight the bridges on all the divisions are being re replaced plated with heavier structures structure tur and the track gelald with heavier steel rail it has been demonstrated by actual experiment thit that these chefe changes will result in an increase in train loading in some gome places ot of more than SO 50 per cent the average being about 42 per cent it Is the hope ot of the receivers that within the next two years the baltimore ohio railroad will be an 18 toot foot grade road from chicago to Balti bartimole mole with the exception ot of that portion ot of it which passes over the mountains where helping engines will have to be used A great many ot of the estimates for or the different portions of the work have been made and those who have seen the plans state that the work can be done at a surprisingly low cost considering the return it Is understood that the policy of 0 rehabilitation adopted by the receivers two years ago will be continued by the new company alter after the beor ani bation |