Show JAG SON TRUSTEES WILL OPEN BIDS POE FOR BUILDING MAY 4 Baton Hall Hall to Be Finished In Time I IFor For Tor the Next School Year at a aCost aCost aCost Cost of An enthusiastic tic meeting of the true trus trustees tees o atthe f the Sheldon Jackson was wes held la leet t evening in the office of nf lam Bam Bamberger lamberger berger at hi Dr Jack oi who arrived yesterday was s pres pr arat It was decided ed at Jt t the meeting to open the bide for the ohe construction oon of Eaton halt hall on May 4 and soon Goon after that the work of building the uil rih begin It win be finished by the too flirt fim fi t of Sep September September September for the hall ball is to be open at I that time tim to pupils The building Is IsUf t coat et between and and the money ume to ta complete t lt t is Ic in Arrangements Arran wena wem made mode last lost night t to 10 sand power cf tf attorney to lo an agent lit Iii New York who can ean then forward the tt ironey ne The architect of the lug lag Ia W E Ware There was also airo considered the e of the Hie C us which were received from Architect of Philadel phiaL phia According Ac to these thea plans the new hall wit be constructed in the tSie northeast corner of 01 the |