Show The Puunuia anal New York 8The Worlds Panama correspondent writes on February 26th A dispatch it is reported arrived recently re-cently from the canal companys office Pans fixing the Pacific mouth of the proposed canal somewhat to the east of the site previously selected the mouth of the Rio Grand river The Canal newspaper news-paper says that the FrancoAmerican trading company have signed a contract for cutting seven miles of the Panama side from the new outlet to Paraiso Chas DrtLes ep3 will be present on the 28th day to inspect the work done His visit no doubt will lead up to the third alt 1 for another 5150000000 Of the 30 OUO OOJ already paid in it is said but little remains Not a foot has been cutout cut-out for the canal proper An English dredge is deepening the channel in Fox river Panama is premised a theatre and wterwork system A canal officer is in Paris now trying to secure 540 000 to build it He failed in New York some months ago in the attempt he made to plant the loan |