Show II THE HORN SILVER From theN ew York Daily American ExcJiange we learn that tbe new refinery of the Horn Silver Mining Company at Chicago is about completed and will be ready to commence operations sometime this moth It will have a capacity for refining fifty tons of base bullion per day Hoisting works similar to tboee of the new Consolidated Consoli-dated Virginia Mine have been shipped to the mine and will be in operation aboutMay 1st They will be capable of raising 500 tons of ore per day from a depth or 650 feet The capacity of the smelting works at the mine will be increased to about lEO tons of ore per dRY by tho addition of a number ol now stacks As soon as the railroad to the mine is completed arrangements will be made to sell a largo quantity of ore per day lo the Salt Lake smrltere |