Show PRELIMINARY WORK IN i RAILROAD I Work preparatory to electrifying the railroad between bet n this city elt and Ogden Is la progressing stated President Simon Bamberger Ills fits trip to Chicago to purchase additional supplies has IMS teen Leen delayed a few days daB on account I I of certain plans not arriving at the ex expect expected I peeled time but he states that little time I will be lie lost for the reason that the steam I shovel which Is working constantly under two o crews has considerable to do before 1 other branches of the work can be taken up The plans that Mr Ir Bamberger Is now no waiting for are for setting the poles These are expected t to arrive alThe at any time now no and as soon eoon as s thc th they come a gang of men will be put to work setting thorn them where possible and later In places TV where here the steam shovel is s engaged en ged In widening cuts |