Show SNAKE CREEK TUNNEL MAKES GREAT RECORD The big ore bore bolo of the Snake Creek Mining Alining Tunnel company had hod reached the be point before J S So Free left loft camp Tuesday Tue ay that distance hav hay having havIng ing log been beon made since Ince work ork was Wall started on May 11 That means that tbt the con contractors contractors tractors have been bean driving the tunnel at the UIE rate of feet teet a n month and Mr Free says sa that somewhat better progress Is Ie being made now lie II sues es esne ne no reason why that rate should not he be maintained throughout which would mean that a new record r for tunnel driving would be made The total length of or tho the tunnel is to be feet and the rate of progress which the contract requires shall be main maintained tIned tamed is feet reet a R month A new blower and electric motor are aM being In Installed stalled at the tunnel |