Show GET IRRIGATION WATER TO RUN POWER PLANT Tho The Utah Light Railway company has hu been successful tul In arranging alT with the farmers In tho the Weber valley to divert dhert the water front from the irrigation ditch dUch long Jong enough to fill the dam at Devils Gate Oste power plant The plant wilt will be he started up in two or 01 three days dya 8 after tho the generators have hae beon been cooled out Owing to the dry season which lies has caused a scarcity of water the plant will wm be run on less lM than half capacity PAdl |