| Show MASON VALLEY IS PUSHING Orders Are Placed for Ma Machinery chinery Grading for Spurs Nearly Finished Orders have been placed tor or tho the ma materiel m tend and machinery for tor the tho Mason Valley Vaney company works and machino shops In connection with its Ita Is smelter at Wabuska according to General Man Manager an ager agor Jules ules who has returned from camp Contract for furnishing tho the lumber required for the plant Is about to be bo signed Grading of spur tracks track to the smelter site and to the tho mine as well wet Is almost com corn completed complete and during the coming week will wil be begun the tho work of ot excavating ing for the smelter With Wih the rail railroad rai railroad road In position to land material at atthe atthe atthe the smelter site construction worK wOr c will willbo wll wIllbe be bo pushed rapidly With Wih no serious In the delivery of material and machinery lna the smelter should shoud bo ready read to go Into commission next Juno June uno Ample tonnage of o ore to keep a 1 smelter running 01 for many years Is already assured and one of the at attractive attractive features of the project Is that all at al hand of tf the fluxing ore oro needed is close cose Mr Labarthe confirms tho the good gool re report report report port of the new now strike in tho the Mason Iason Valley mine the first fIrt definite information mutton mation maton concerning which was brought to this city cl by Consulting Engineer Fred A A Flindt It I removes all al possible doubt of there being a great mine at depth In the tho property |