Show SUSANNA MILL ABOUT READY FOR CLEANUP Satisfactory St operations at tho the Su Sc sanna mine Park Hia Valley Valey district are reported by y Har harry Martin wh abe 1 Is In Ute Use city i from camp Tn Te The n nw new w Lane mill mi which handles 30 H tons of or ore a day 17 d te Ii doing excellent work he ho says MYS A cJ cleanup ef of approximately 11 of gold geld gok bullion bulon Is to be made within the tho next Boxt few tew days das Connection was re ro costly IU made load de between the lower loer tunnel an and ft a fF front m the upper tunnel i sail and the mine Is showing good oed form production Is being made from Irom from oJ three feet ret of ot ore oro on the hanging wall wan of the bl big lf vein and from a body bed on 1 the milling foot Coot grade wall wal tho the ore being all al of good god i |