Show NEW NEVI SCHOOL PLANS DONE BIDS INVITED The Technical Training Institution Will Be Located on the tho High School Grounds G unda Cannon dr Fetzer have bave computed completed d plans plan for tor the now nov technical training school chool building to be erected on the High school ground at Second North and Third West Wes streets and bids bide t m be e Invited In order that a contract may ma be e awarded within the next few week It t la Is I proposed to start work wort on un the tho building bulletins as quickly as ai possible The Tho training school will be bo 2 feet In size also and will be erected erect d between fn the be h present manual training school and the tie union school building The rh true ture ure will be of brick and concrete and absolutely fireproof The wn w ll run lengthwise north and aDd south the iho 70 tO toot foot frontage facing south The ends end for tor a n distance of or I foot feet will be bo one tory story high while the center portion onion of tho the building feet will wUI be bo two stories up In the northeast corner of the build Ing ng will be located tho foundry depart mont ment with the In tho the north west corner To the south will be lo located located located the machine shops and an e uth of that hat tho the wood woo turning department On the tho east enet aide Ilde south couth of or the foundry room will ho bo located the pattern and carpenter shops finishing rooms and other departments Estimate Estimates of ot the tho cost of ot the tho at rue turo ture ure have been submitted to the hoard board if of f education but have hae not yet been made public |