Show NEW ORE IS FIFTEEN FEET THICK I After Ator being In ore for tor 22 2 feet ret the tha Tonopah Belmont shaft shat ham baa ba passed puM through tho the ore body bod first firt encountered at the tho point proving the new now vein vain to be bo fully 16 15 1 feet wide all al of or which carries milling values alue The shaft Bar Is now within a n few tew feet of the 1198 1190 foot root point point whore a n station will be cut ct and sinking resumed resumed No development work will wil be done dODO on the new ore body bd until the shaft sOt has been oem com completed om from tho the point to the surface and placed In commission lon as 8 the present equipment Is taxed to Its lu limit the older handling workings workings the Ore and walte waste from |