Show CHIEF CON cor GETS ORE OREIN OREIN OREIN IN RAISE FROM 1600 A At Al i Important new development in the Chief Consolidated mine in Tintic Tinte Is Iste t te e of rich ore in a raise which wf teh is being driven from the 1608 1600 1616 fott fot tOl t level The ore body on the 1400 toot loot level dips toward the te south and the therise raise rise was driven to Intercept it It The strike was made only 20 0 feet above aboe the Ule 1800 isoo level and there appears appers to be no doubt that It I is I the downward extension of ot the ore mined in the 1400 If I that is true truc highly satisfactory results are as assured a assured for the ore above is of excellent grade gade Regarding the property a large large eastern interest says Chief development work vork shows to today today today day more mor ore In sight than tan at any pre Io s stage In the short time of the theres mires res operation which is barely over ore ole year ear and for ore extracted In open opening opening Ins ing ing work ork during that period there has lias been bee from the smelter a return of ot a better than If I this cam c ca be he accomplished In one year with wih EUC sue a comparatively small smal amount of work much greater geater results may be ex exe pee e tul tod from the more extensive work that tha th Is s ts to t follow In a recent letter letteri i Ir t r t Fitch Fich expresses himself himsel as ex welt well wel pleased with wih results result and li in regard to the future |