| Show OHIO COPPER MILL TO GRIND IN THREE WEEKS The building of the trestle for the tho Ohio Copper electric ore line Une from the Mascotte tunnel should be ho b completed within the next two or three weeks Man Manager Manager Manager ager Colin Cohn Coln McIntosh said sid yesterday esterday With Within in two weeks the section mill mi will 11 be b ready to go into commission so 5 that the time mill mi tonnage or 1200 12 tons a day will wi be b available when the theline theline line lne is I in readiness to transport the ore from the mine Ore bins and chutes are In place and an everything in the mine is in form for for tor production upon the scale re required required |