Show MAY DAY IS READY TO DRIFT ON O J 1100 LEVEL The shaft in the May Day mine has reached the level l el the sump be low that level is complete and drifting will wi be started in a few days for tho the theore ore body bod the top of which was cut by the drift on the level Jevel In the event that the ore body maintains the dip which is indicated by sunk on the 1000 Io level the drift on the 1100 should reach it within feet fett The drift is 10 fet ex cx expected to prove enrichment at depth of the great vein rein which became below the level |