Show NOTHING SMAll I ABOUT MORAN I He Is Fixing Entire Outlet Pipe Apparently Just to Show That Th t He Can I II I 4 Patrick J Moran city contractor la Is managing to negotiate a tidy little piece of work out of ot the repairs of the intercepting sewer outlet pipe He is not only stopping stop the leaks under the railway yards which he was authorized to do by b the committee which w ch had ti I I I charge but IB is covering the entire leaky portion of the pipe west of or the tracks with cement Ciment This will probably cost Lot The work was in the hands of ot the mayor city eft engineer and H G McMillan McMillan lan Jan chairman of the board of ot works None of these ie is prepared to take the responsibility for tor ordering the extra work done It was not mentioned at atthe atthe atthe the meeting of the council Monday londay evening there Is no record of ot any order at the office omee of the board of ot public works work and City Cily Engineer L C Kelsey says that he gave no order nor did he know of any Morans work on the pipe it Is asserted as asserted asserted amounts to an admission on the part of the city that something more is needed to keep it il from leaking than was In the plans and specifications under which the contractor did the work It also means that the Campbell Building company com pan will be paid for the entire pipe just as it would have been had there been no leaks in it at all Just Justas as soon as anything not in the specifications specifications was done to the pipe to make It 11 water tight it is pointed out the city elt waived Its right to refuse ret ee acceptance until the leaks were stopped Several of ot the councilmen councilman were trying try tryIng tryIng Ing to find out yesterday who had the temerity to go 10 ahead and order work that will cost the city so much without consulting someone connected with the city council coun |