Show LOGAN CONTRACTOR FILES AN ANSWER John W Barrett a contractor of Logan filed an answer and counter claim to a asuit al I suit recently filed against him in the fed federal federal federal eral court by bJ the board of home missions I of the Presbyterian church Th The suite suit I filed flied by the Presbyterians was to recover paid to Barrett for the construe lion flon of a school hool building at Logan The complaint alleged that the building was Rot hot ae according to specifications tiona anti and a was W totally unfit for or use I Barrett now files a cross complaint against the plaintiffs plaintiff in the former Conner action alleging that the building was built ac Be according according cording to th the plans given him at various arious times but on account of a large lar e number of changes made in the original plans It was impossible for Cor him to erect the build building building building ing to their complete satisfaction He lIe asks that he be be granted ranted 46 which he hf says is still sun due him on the original con eon contract contract I tract |