Show SEWER DISTRICT 18 IS FLOODED flOOD D Failure to Take Care of Plow How Delays Belays Work on lateral Ex Extensions Extensions Extensions tensions The streets committee of the had something to say last evening about the work on sewer extensions and 59 following a resolution introduced in inthe tho the city council Monday evening directing the board of works to order the contractor tor James Kennedy Kenned to rush the work It appeared informally during the evening that the fault rests rather with the tho city engineer than with ith the contractor who has been unable to do the work on account of the way in which the intercepting sewer is flooding the western portion of the city The pumps at the new sewer have not been working for a week and the result is that the water Ilter has backed up and is drowning out the west wet side Mr OConnor said that as soon as the water is out of his way work will wilt be begun on the sewer extension extensions I Of the sewer extensions which are being delayed by the failure of the pumping I station to keep the water out of ot the way some somo 1 feet of tho the eleven cloven miles of sewer have haye been laid |