Show l OHIO COPPER TO I I COMPLETE MILL Mascott Tunnel Being Driven I ii to Make Connection with L the Shaft Colin Cohn Mcintosh general manager of oC the theL L Ohio Copper company compan got work well un tin under under tinder der way In the Mascott tunnel during the week and It is understood that the work of ot installing machinery in the tho concentrating mill nil at the mouth of the tunnel will be started at once says sas the BIngham Bulletin The manager says sas that he has been Instructed to have the L mine and mill ready for production with within withIn in five months month The tunnel must be driven about roo feet to reach the tho point of oC connection with the shaft The Tho shaft is down feet on the vein eln which is hi about the distance to the tunnel level It is tho the Intention after the tho tunnel shall have havo reached the objective point to prosecute both sinking and upraising until connection with the shall have been made It is said to be possible to make mako close to fifty feet a week driving tho the and the work Is to be pushed |