Show ESTIMATED AS COST OF DETOUR AT PARLEYS PARLEY'S CANYON Cost of or building a n. d detour tour on tho the thoVa Wa- Wa satch satch-Bonneville boulevard around the mouth of oC Parleys Parley's cnn canyon on Instead of oC n a abridge bridge would be approximately according to estimates considered at the meeting of oC the tho count county commission commission commis commis- sion slon yesterday The Tho commission had previously decided de decided decided de- de to build a bridge c as a a. memorial to soldiers sailors and nurses of oC Utah who served cr In the recent war Bids offered on plans prepared for COr tho the memorial memorial me me- morial bridge were approximately 2 and it St was questioned whether er r building such a structure would be feasible with labor and materials at present prices The proposition was re referred referred referred re- re to the road building advisory advisor committee and action deferred for one month The detour which w was suggested yesterday would bo less than one mile long tonS and would bo be on a steep grade Two small bridges ono one across the creek creck and the other across the tho of ot tho city waterworks s system stem would be bo necessary and these alone would cost according to tho the estimate Until tho the mouth of the tho canyon is bridged or the detour constructed tho the thea Wasatch Bonneville n a Bonne boulevard boule Is divided di divided divided di- di vided into two separate links s. s |