Show I HEREBY BY THE of Salt Lake h a of the tho Intention of such to make the described Improvement tom to- to m ide and construct concrete th north side of Michigan l East street I w at aVenue nU and the topping ret rete to the tho three quarters 3 thick and said stId sidewall sidewalk to 6 5 hot feet wide in Sidewalk Die i. i iO according to plans pro pro- on file In the C the City Engineer and defray portion of the cost and thereof by a a. a local assessment or pieces of ground to be and aid benefited by said Improve Improve- within DoUglaS Park Park- plant section nina 9 town town- 11 south range one fl 1 east ce base and meridian fronting ins Ing upon the street above nd to a depth or fifty 50 feet Ira said Bald street and within the tho on th the north by Hub Hub- nue nie on the east cast by n the by Harvard ave on the west Weft by Fifteenth East tal oot of said improvement ted at- at at twelve hundred ninety ninety- dollars of um lure the portion IC s hundred thirty five and 08 P 5 dollars or one and 72 sQuare Kollars per front or linear hInett foot Ipg property for said sahi sidewalk Detests an and abjections to tile tho rout of such Intention must be in writing stating therein t Kl or description of proper proper- po Ie Lily Recorder on or before ay of May 1920 ward board of Commissioners at Its meeting meeting- thereafter loWth lo- lo day of May 1920 will conf con con- f Proposed levy and hear and uch protests and objections proposed Improvements as shall n U made er of the Beard of f S Commis- Commis T lAk Lake City Utah 8 1920 I w. w A. A LEATHAM S City Recorder Extension A No April 9 9 1320 1920 May 3 1920 |