Show NOTICE NOTICE IS HEREBY I GIEN GIVEN B BY THE Board of or Commissioner of Salt Lake City Utah of ot the intention of or oit such Board of ot Commissioners to make the following described improvement Improvement towi to- to wit wi To grade grade and and pave with wih crushed rock base and bituminous concrete wearing i surface and install water services 8 on Second South street Third South street and Fourth South street between n Douglas Doug Doug- DouClas las street and Thirteenth East street t tand and Douglas street between Second South street and Fifth South street In Paving District No 32 33 said paving Ao be 36 feet between curbs on Douglas fo IJ street between Second and Fifth DOUgas streets 40 feet teet between curbs on Third l South treet between Douglas a sect and Thirteenth East street and s n between curbs on Second South and r and on l Fourth 1 South street t. t each lt tween Douglas street and Thit East street stroet and all nl of oC said PAVe to be six 6 Inches thick with fou tour four wih Inch crushed rock crushed rock base and two Inch bituminous concrete Wearing searing face face- according to plans profiles profiles' specifications on file in the rie fi tho City Engineer and defray thi the ofie ab portion porton of or the cost and ex at thereof by a local c assessment upon UPOn- i lots lot or pieces of ot ground to bo be and by by said improvement J within Blocks 18 18 23 6 26 6 anH andt Plat Flat F F Salt Sit Lako City Survey fr Ing or abutting upon the streets ar at ab named and to a depth of fifty 50 fl back from said street and all al wi wj Wit l the district bounded on the north First South street on the east by T Th TI East EaRt street on tho the south Fifth South street t. t and on tho the west WeS Twelfth East street street The Tho eathna cost per front foot oo does docs not include include- stalling of oc water services the cost coat which Is to be assessed a again against property benefited in addition to tor rc regular ular assessment 5 The he estimated cost of or water Ben servi 1 Is twenty and no 2000 2000 doll dolli dol Tho The total cost cost of said estimated at nt four forty-four thousand 1 hundred five fifty and 70 I 70 55 70 dollars of which sum suns the th aV ab al lers hers portion is thirty five thou ol eight ht hundred eighty and 65 U dollars segregated as folio bIb Estimated cost of abutters Port Dort for tor the JG iG foot roadway Doug DoUK street Second South street streel to F Fi 11 South street is two twenty two thou three hundred five fifty and 40 U iO 3 10 dolar dollars or five thoe and 70 O I dollars per front or linear j Ia of or abutting property Tho cost of or abutters abutters' portion porton for forty 4 toot foot roadway Third South tH Douglas street to Thirteenth 1 It street street is thirty five hundred elg four dollars or six and 40 40 G. G O per front or linear foot toot 1 estimated cost of ot abutters abutters' portion porton fifty C 30 O foot Coot roadway Second Second S So street stroet and Fourth South street bot Douglas street and Thirteenth j street is nine rune thousand nine hu hurt hurI r rI one forty and 23 2100 do dold ad ador I or eight and 25 5 doUar dollar 1 front or linear foot toot fa 11 J All l protests and objections up I carrying out of or such intention m moa mat presented In 11 writing stating t then the erl sf lot and block frontage in feet teet or of ot property to the GUy City II 1 corder on or before the tho das da days April 1920 Sf The Board of oC Commissioners a at first regular meeting thereafter wi wit the 1 th da day of oC April 1920 i consider the proposed levy Jevy and 1 hI 14 and consider such protests and ob to said Improvements as a sh lons have been made t By B order of the Board cf ct Comm Conn of oC Salt L Lake ke City Utah Utah J Dated March tarch lath 1 1920 0 w. w A. A J LEATHAM THAt City Recorder Record Paving Paving Extension No o. o 19 J First publication March Last publication April Apri 1920 |