Show I I I BOND ISSUE FOR WATER IS FIXED Sinn Sank Decided On by City Election in March larch By fly a a. vote ote of four tour to one the th cit city commission yesterday fixed tho amount of oC the the- proposed bond issue for Cor the Improving improving Im Im- im- im proving pro of the tho city water supply at and announced that an nn election elec tion on the issue will DO oo called the latter part of or March Commissioner Theodore T T. Burton voted ot against ng the tho Issue His amendment amendment amend amend- ment merit to tho the original motion fixing tho the Issue at had previously been en voted down The Tho contention of ot Commissioner Burton Burton Burton Bur Bur- ton was that the city at the tho present time 8 should only secure water and water rights necessary to take care of or the present emergency It was admitted e by City Engineer Sylvester Q Cannon that would probably take lake caro care of ot tho the present present present pres pres- ent situation situation- but that when the time came for the tho expansion o of tho the system additional water rights and other othor property property prop prop- crt erty would have risen risen to practically prohibitive figures Following the meeting C C. Clarence slen Ne-slen commissioner or of water supply and w water ter works said that the city engineers engineer's office was already working on the plans for Cor raisin raising the Mountain Doll Dell dam tort forty foot feet ct and that this would rive give I e that reservoir reser a capacity of ot a billion gallons This said Mr heslen will be th the first move after the tho passa passage e of ot the tho bond Issue and Construction construction con con- will be completed complete so EO that the tho flood lood water of ot 1921 could bo he held hold for use The construction of a largo dam am in Big Cottonwood will also be started as ns soon as possible announced Mr Nes Nes- eslen es- es len This dam darn will ill probably be 00 built bunt near the tho Junction of or South Fork and ond the tho main canyon canon and the tho intention Is Isto Isto I to have havo at least one unit of oC that dam completed in time tim to store the flood floo floodwaters waters of th thi of ci 1921 1121 I |