Show I I RESUME RESUl INSTALLING LIGHTS AT DUCHESNE Special b. b 12 12 Installation of the electrio U light ht YB system for Duchesne will iiI be ho rc fl here next week weck when workmen representing tho thA h Power lower k ic Ih t company will ho hogla l wiring wiring- residences and s blocks Although h the tue termination of or the thc contract con con- ont oIt It does docs not come until t tract r with th the th city November 1 It is Jill the plan ot of the campan com cam compan company officials to 10 push th the work ns mis pan pany Ta rapidly as possible Promise that th the be ho before be power will wUI b be available fore tore th and end of or Tul July ha has hen hoen made b by bythe the O. oU Dt Uw IID jW |