Show ROAD BOARD fAST FUST IN FILLING OUT REPORT What Is considered one ORO of ot the speediest speediest speed speed- iest lest pieces of work has been accomplished accomplished pUshed in the office of the state road commission last night when that office received a n communication from L L. W. W Page Pahe director of or the office oHice of ot public roads and rural engineering at Washington Washington Wash Wash- ington inclosing a l copy of ot the final agreement of or project No 1 post road by b which Utah will receive the benefit I of the federal appropriation of approximately The letter was dated June 19 and the instructions instruction's contained in it were that the must be returned to agreement eo T. T In 1 1 V U uy 1 UIL J. 7 t. t L LI June 19 to June 24 to reach here about aboul two hours was all that was as allowed the tho road commission In which to fill out sign and return the agreement to toto toto toto to Washington Project No 1 covers the post road from Castle Gate to Duchesne about tod forty five miles In length |