| Article Title |
Tintic Mines in 1915 Ship 138,500 Tons Ore Valued at $3,470,000; June Output Amounts to 568 Carloads worth $710,000 |
| Type |
article |
| Date |
1915-07-04 |
| Paper |
Salt Lake Herald-Republican |
| Language |
eng |
| City |
Salt Lake City |
| County |
Salt Lake |
| Page |
31 |
| OCR Text |
Show TINTIC MINES IN 1915 SHIP TONS ORE VALUED AT 34 JUNE OUTPUT AMOUNTS TO CARLOADS WORTH 1101 Tintic's production during the first half halt of ot 1915 1916 amounted to a total of or 2770 carloads estimated at tons of at ore valued at Tho The total for tor Juno was carloads estimated at tons and valued at These figures ures compare with the tot tola l yearly shipments from the tho camp in 1914 of at carloads and fall tall a little litti below tho average The recent monthly month month- ly productions were carloads In Inn May n In April in March In February and in January Chief and Mammoth In June exceeded any of or their other monthly production so far tar this year There were two twenty shippers in June and thirty four Inthe in tho the first half halt of ot 1916 1915 Th The Individual productions in June and the totals for the tho first half haIr of ot 1915 are arc given below In carload lots lots- Cars June 1st hf ht Cars 1915 Sioux mill mm dump Iron Blossom 86 50 Chief Con 82 35 Mammoth 57 57 Eureka Centennial 1 72 73 Eagle Blue Bell 39 Gemini 26 Grand Central 18 18 83 Dragon Con 14 14 91 Victoria 9 36 Gold Chain 8 S 42 Beck Tunnel 7 34 14 Bullion Beck 6 35 May Day 4 61 Carisa lease 4 I 16 Sioux Con 3 18 IS Uncle Sam 2 l 12 o 2 3 9 Colorado 2 30 Eureka Hill lull 1 25 Godiva 1 9 Yankee Con 1 i i 19 IH Black a c It J Jack a c 1 4 1 Tintic Standard 2 Lower Loer Mammoth 62 I Ridge Valley 1 Utah Ore Oro Sampler 3 Minnie Moore 4 Utah Mm l Conti 3 I United nit ed Tin Tintic tic 1 Clift lease 1 Dubuc lease 1 Salvador 1 Copper Queen 1 I ITo To Totals ta Is 2 2770 j 7 0 |
| Reference URL |
https://newspapers.lib.utah.edu/ark:/87278/s66t1sjq/10128221 |