Show NOTICE TO ro CO CONTRACTORS SEALED BIDS WILL BE RECEIVED b by the undersigned up to 1 p. p m. m December Do- Do cember 18 18 19 1912 for all al materials and ana labor required to completely construct the cement walks wants steps stops and terraces surrounding the tho now new central building for fOl the of or Utah on its campus camp camp- us just east cast of or and adjacent to Salt Sal Lake City Utah according to plans specifications and details prepared by and open for tor the inspection of or bidders at nt the T Templeton of office of 01 Cannon Fetzer and aud Ramm Hansen associated architects Sa Salt It Lake City Utah All Al bids wilt will wil be publicly opened and read at the above time Limo at tile the Deseret National bank In said city et All Al bids bid must bo be addressed to the University of ot Utah Salt Lake Lako City Utah and marked In tho the lower Jower loft lott hand corner Bid Bid Bids must not contain conditions qualifications Ids propositions or things other r than arc lIe called tO fork and ad bidders must use without change tho the form torm of ot bid hId to bo be obtained from said architects No o other form of bid will wil be received Each bid must be ue accompanied b by a certified check cheek on some bank banI In Salt Sal Lake City Cly Utah for at least C 5 C per percent percent percent cent of the amount thereof payable to tho the undersigned The amount called for tor by said check Is to Ito be forfeited to the University of or Utah if It the bid bi ac ac- companying I it t is accepted and the bl bidder hid bid tier der falls fails to enter Into the contract and and furnish tho required bond within five days ays after its ih acceptance The rhe successful bidder will wi be required to furnish a satisfactory surety bond for tor 50 0 per cent of or the thc amount of the contract contract Tho The form of at contract and arid bond ar arat are arb areat at the office of or tho the architect and end can there them be inspected Each Bach bidder will wl be required to state In fn his proposal the tho tine time required require by him to complete completo tho the work as well wel bi as tho the cost and this element of or tm time will vill willbe wi be he considered In conn connection cUon with wih thc the proposed cost In fri making makinI the tle award Tho Tile undersigned d reB reserves tho the rl right ht to reject any and all Il bids or to accept any an bid it ma may deem best U UNIVERSITY OF UTAH UTA |