Show RiO RID GRANDE OffiCIAlS LEAVE fOR DENVER 7 Declare That 11 More ore Facilities Needed to Properly Handle Huge Illge Traffic A A. K R Sweet vice vico president of or the Denver Rio Grande rande in charge e o of operations opt op op- t and J J. J G. G Gwynn chief en engineer en- en of or the lie road load left yesterday for lor Denver Den to 10 make an nn Inspection o of the road They have been 1001 looking over oyer tho the Salt Sail Inke kE terminals and new newChurch newChurch newChurch Church Farms yards to which additions are contemplated i In the spring Mr Ir Sweet would not say ay whether the road contemplated more Improvements In Salt Sait Lake Jako o. o but admitted that thal traffic wa was so o heavy that more room would t be necessary to to properly handle trains Mr Gwynn said paid that ho lie had not seen the tho latest reports in with the surveys which were vere run run into tho the Uintah basin but that upon his arrival In Denver ho he would go o into tile matter malter II H U U. Mudge f president of tho the road is the tho on only official who is authorized to tomake tomake make statements in rear regard to the basin survey Tho rho traffic over the Utah lIn lines s of or tho the Denver it Rio Hlo Grande Grando is said to be the heaviest in the road s history |